TZ 301
This case study outlines the cost, schedule, and feasibility analysis provided to Protexa.
This author has not written his bio yet.
But we are proud to say that PelagoManage7 contributed 11 entries already.
This case study outlines the cost, schedule, and feasibility analysis provided to Protexa.
This case study outlines the vessel condition survey services provided to Protexa in Mexico.
This case study outlines the vessel condition survey services provided to Cotemar in Mexico.
Pelago Management led the delivery, commissioning, and preparation for operation of the Drillship West Draco. We were engaged as Ship Manager for the maiden voyage to its stand-by location where we managed the rig while warm-stacked.
Pelago Management led the delivery, commissioning, and preparation for operation of the Drillship West Dorado. We were engaged as Ship Manager for the maiden voyage to its stand-by location where we managed the rig while warm-stacked.
Pelago Management led the delivery, commissioning, upgrade, and preparation for operation of the Atlantic Zonda, ensuring it met all operational and regulatory standards to operate for Petrobras in Brazil.
Pelago Management carried out a pre-purchase survey, managed the handover, led the warm-stacking, reactivation and the 10-year SPS on the 7th generation Drillship Deep Value Driller, ensuring the vessel met the operational and regulatory standards to operate for ENI.
This case study outlines the vessel condition survey services provided to Grupo Carso in Mexico. The project described herein was executed by Svend A. Maier in his professional capacity through a company he previously co founded and co owned with another party.
This case study outlines the vessel condition survey services provided to Grupo Carso in Mexico. The project described herein was executed by Svend A. Maier in his professional capacity through a company he previously co founded and co owned with another party.
Engaged by Kuwait Drilling Company in Kuwait to manage the phased overhaul of its land-based drilling fleet. The project described herein was executed by Svend A. Maier in his professional capacity through a company he previously co-founded and co-owned with another party.

© Copyright 2023 Pelago Management AS
+47 22 33 44 55 | post@pelagomanagement.com
Registered number: NO 929 245 318 MVA
Privacy Statement | Website by MOFix Design
MALTA
Dragonara Business Centre
5th Floor, Draginara Road
St. Julians, STJ 3141
NORWAY
Badehusgata 33
4014 Stavanger
