Project Background
Client: Bluewhale Offshore
Asset: Bluewhale 2
Location: Yantai Shipyard, China
Project date: May/June 2026
Objective: Technical support during reactivation of the DP3 Semi-Submersible ‘Bluewhale 2’ at Yantai Shipyard, China.
Consulting – Technical Section Leader
Pelago Management provided technical support to relieve the Technical Section Leader during the reactivation program for the DP3 Semi-Submersible Bluewhale 2 at Yantai Shipyard, China.
Key Activities:
- Provided Technical Section Leader support during the reactivation program.
- Relieved the existing Technical Section Leader for a five-week period at Yantai Shipyard.
- Coordinated and supported ongoing technical, maintenance, repair, and reactivation activities across the rig’s technical disciplines.
- Supported technical troubleshooting, prioritization of outstanding work, and coordination between the rig team, shipyard, contractors, and other project stakeholders.
- Reviewed the technical condition and outstanding work scope with consideration for both immediate reactivation requirements and longer-term asset integrity.
- Applied experience from Bluewhale 1 and Bluewhale 2 D90 design, construction, SPS, operational phases, and shipyard reactivation activities.
Outcomes:
- Delivered short-term technical leadership support for the reactivation of Bluewhale 2
- Supported continuity in the Technical Section Leader role during a critical phase of the reactivation program.
- Played a key role in establishing a plan for the upcoming SPS on Bluewhale 2
Conclusion
Pelago Management’s contribution to the Bluewhale 2 reactivation program demonstrates the company’s ability to provide experienced offshore technical leadership on short notice. With relevant knowledge from Bluewhale 1 and Bluewhale 2 design, construction, SPS, operational phases, and shipyard reactivation work, Pelago Management supported Bluewhale Offshore with reliable technical support during a time-critical assignment.
Contact information
Tor Inge Gran
tig@pelagomanagement.com
Asset Specifications:
Design: Frigstad D90-5
Construction Yard: Yantai CIMC Raffles Offshore Ltd
Construction Year: 2017
Positioning System: DP3 and Pre-set Automatic Thruster Assist
Hull Dimensions: 123m x 93m
Displacement: 69,768 MT
Maximum Water Depth: 12 000 ft.
Drilling Depth: 50 000 ft.
Variable Deck Load: 15 700 MT
Moonpool Size: 44m x 9m
Maximum Transit Speed: 10.0 knots