Project Background and Objective
Client: Deep Value Driller
Location: Westcon Yard, Ølen, Norway
Project Duration: March 2021 – September 2023
Background: Deep Value Driller Ltd acquired the 7th generation drillship Bolette Dolphin in March 2021. Initially warm-stacked in Norway, the vessel remained in this state under the new ownership until a 3-year charter contract was secured with Saipem in Q1 2023.
Objective: Pelago Management was engaged to manage the vessel during the warm-stacked period from March 2021 and complete the reactivation/SPS phase prior to handover to Saipem early September 2023.
Survey
Pelago Management carried out a pre‑purchase survey of the drillship on behalf of the Client, focusing on its structural condition, key marine and drilling systems, maintenance history, and compliance status.
Operations
- Vessel Handover from Dolphin Drilling: Ensure a safe and high-quality handover from Dolphin Drilling to Deep Value Driller Ltd.
- Manage the warm–stack period: Ensure implementation of the System Integration Testing (SIT) and the preventive maintenance procedures.
Project Management
Pelago Project Management Team:
- Project Manager
- Site Manager
- Well Control Equipment PIC
- Drilling Equipment PIC
- Marine PIC
- Mechanical PIC
- E&I PIC
- Cost Controller
- Planner
- Buyer
- Document Controller
- Crew (31 members)
Pelago Management, in collaboration with the vessel owner, Saipem and Westcon Yard, meticulously managed each phase of the project:
Reactivation
Reactivation from warm stacked status:
- Structural & Hull inspections
- Equipment overhaul
Asset & Operational Preparation
Ensure asset meets contract specifications, OEM and client requirements:
- Planning and Budgeting
- Prepare work packs
- Procurement of long-lead items
- Pressure Vessel & Machinery checks
- UWILD
- Obsolescence equipment/systems management
Planned Major Maintenance / SPS
Ensure that the asset is in full compliance with class and regulatory requirements:
- Recertification of equipment and commissioning of systems and vendors’ packages.
- Sea trials, DP trials, shock and motion tests where required.
- Class & flag state certification, final acceptance by charterer.
- Implement Condition Based Maintenance (CBM) on drilling equipment.
Conclusion
Pelago’s strategic management and technical expertise ensured the project’s success, reinforcing its reputation for delivering complex, high-stakes maritime projects with precision and efficiency. The deep Value Driller now stands as a flagship asset, ready to redefine industry standards with advanced technology and regulatory compliance for offshore operations worldwide. The project showcased Pelago’s unique service offering as a Project Manager:
- Fast deployment of project team on the ground.
- Executing comprehensive project within a tight schedule.
- Fostering collaboration among multiple stakeholders.
Pelago gratefully acknowledges the dedicated efforts of the project team, partners, and stakeholders who contributed to this achievement.
Contact information
Tor Inge Gran
tig@pelagomanagement.com
Asset Specifications:
Design: Hyundai/Gusto P10000
Hull Dimensions: 752ft x 118ft x 59ft
Displacement: 70,052 mt
Operating Draft: 36ft
Maximum Water Depth: 12 000 ft.
Drilling Depth: 40 000 ft.
Variable Deck Load: 20 000 mt
POB: 210
Cabin Type: 20 x 1p cabin, 95 x 2p cabin
Moonpool Size: 73.5ft x 50ft
Maximum Transit Speed: 12 knots