Project Background
Client: Grupo Carso
Asset: La Muralla IV
Location: Mexico
Duration: Not to be disclosed
Objective: To successfully carry out an independent survey of the technical and operational condition of the offshore service vessel La Muralla IV.
Condition Survey
Scope of Work: A complete condition survey of the rig, including full certification and documentation review. Furthermore, critical equipment to be thoroughly inspected to ensure that the asset meet specific requirements.
Key Activities:
- Conduct a comprehensive technical and operational survey onboard.
- Gap analysis, scope and budgeting for reactivation.
- Categorize and report vessel findings/condition to the vessel owner.
Contact information
Tor Inge Gran
tig@pelagomanagement.com
Asset Specifications:
Design: GVA 7 500
Type: 6th Gen UDW, DP3 Semi-Submersible
Year Built / Builder: 2012/2013, Daewoo Shipbuilding & Marine Engineering, South Korea
Water Depth: 10 000 ft.
Drilling Depth: 35 000 ft.
POB: 200.

